HEAVY WALL STREAM DRUMS & BOILER
Hooper Welding is a recognized leader in design & manufacturing of Steam Drums & Boilers. We have capabilities for heavy wall shell plate rolling and Submerged Arc Welding (SAW) of long seam & circ. seam which is an important requirement for any steam drum & boiler.
Hooper Welding can perform SAW welding of large sized and multiple nozzle to shell joints which improves quality and reduce cycle time compared to conventional manual welding.
Following are a few projects we completed recently:
1) 2005 to 2010: Hooper welding Oakville plant successfully completed multiple heavy wall steam drums for petrochemical refinery plant (Customer: Nooter Eriksen)
a. Job# B488: 7” Thk CS x 84” ID x 518” L x 381,539 Lbs having 14 nozzles 1 -3” & 48 nozzles 8-18” size
b. Job# C171 (6 units): 6.18” Thk SA299N x 88” ID x 543” L x 401,812 Lbs having 25 nozzles 1 -4” & 44 nozzles 6-24” size
c. Job# C375 (2 units): 4.5” Thk CS x 64” ID x 408” L x 148,635 Lbs having 42 nozzles 2-18” size
d. Job# C437 (3 units): 4.75” Thk CS x 57” ID x 408” L x 153,769 Lbs having 40 nozzles 2-18” size
e. Job# C443 (2 units): 4.96” Thk CS x 74” ID x 408” L x 229,370 Lbs having 38 nozzles 2-18” size
2) August 2014: Hooper welding Oakville plant successfully completed critical Boiler Drum for refinery (Chicago Tube & Iron, USA).
a. Job#D424: 3.25” thk CS x 46” ID x 304” long x 48,000 Lbs weight having 1573 tube holes on along the shell length